was, last week applied to two sides of our cellar, a black coat. Unfortunately I can not tell you what this job should this meet with our white tub. Then the perimeter insulation glued and affixed the dimpled sheets as protection for the insulation filling the pit. Next week it will go with the installation of geothermal brine heat exchanger tubes and the rain continues. After Easter, the pit is then tipped again to , so that you can start with the house connections. Contracts for building connections, we have granted to EnBW (electricity and telephone) and a local installation company (water).