last Friday has been poured into our base. Like all other civil engineering work, this was the company of Max & Co. GmbH Habrik over KG-contractors, with which we are so far very satisfied.
in the second, which is embedded in the floor plate Pentaflex-plates are seen, which later on will become the basement joint seal perfectly against water penetration. Moreover, even the under the slab shifted ground wire to see.
0 comments:
Post a Comment