On Tuesday morning at 8:00 clock we had our first date on our site - the site meeting. Important meeting points for us were, for example if a road block in the basement and house building is necessary, or about whether the excavation is to be filled in with dirt floor again. Clay as filler material has the disadvantage that he sets for years and during that time as no paving stones can be laid. The most important result of the call site is the future timetable for the cellar of the building looks like this:
Excavation: KW 11
Bottom panel: CW 12
Keller Assembly: KW 13/14.
now is press it so fingers crossed that we hold and that Peter is to be woken otherwise digging no evil goblins.
The place for our little house is marked by the pink wooden pillars.